A baffle wall was also constructed in the middle of the dam to direct the effluent flow path and ensure the correct chlorine contact time was achieved. Construction of twin 1.1 km ø1200 gravity outfall sewer along the Eastern Beach to the Bats Cave pump station, capable of each delivering 1400lps to the Bats Cave Pump station.
The works to the outfall sewer also included the construction of a new overflow chamber to the pump station and a new pipe bridge over the Blind River. In total 2 235m3 of concrete and 150 tonnes of reinforcing was used across the project.